How much does an ADU cost in Southern California?

The honest answer is "it depends on the type, size, and finish level" — but that's not useful on its own, so here are real cost ranges, what actually drives the price, and what most calculators leave out.

United Build Partners Updated 2026 7 min read

The short answer

Across Los Angeles, Orange, San Bernardino and Riverside counties, ADU construction generally runs $285 to $350 per square foot for hard construction costs. That rate varies by finish level, site conditions, and the contractor you choose — a stripped-down garage conversion with builder-grade finishes lands at the low end, while a custom detached unit with high-end finishes can run well above $350/sqft.

Multiply that per-square-foot rate by your unit's size and you get a construction-only estimate. Total project cost is higher once you add design, permitting, and site work — more on that below.

Typical total cost by ADU type

Because different ADU types are built differently — a garage conversion reuses an existing structure, while a detached ADU is ground-up new construction — the realistic total cost range looks different for each:

Typical total ADU cost ranges by type in Southern California
ADU TypeTypical Total CostTypical Timeline
Junior ADU (JADU)$70,000 – $140,0002–5 months
Garage Conversion$115,000 – $210,0004–8 months
Attached ADU$140,000 – $280,0006–11 months
Prefab / Modular$140,000 – $350,0003–6 months
Detached ADU$170,000 – $420,000+8–15 months

These are planning-level estimates, not quotes — see our full ADU type breakdown or use the cost calculator for a range based on your specific square footage.

What actually drives the price up or down

What's usually not included in a per-square-foot number

Beyond hard construction costs

A per-square-foot rate typically covers labor and materials for the physical build. On top of that, most projects also carry design and engineering fees (roughly 10% of construction cost), permit and impact fees (roughly 8%), and separate site work like grading, utility trenching, or driveway modifications that aren't part of the core construction number. A licensed contractor can break down exactly what's included in a specific bid — treat any number that skips this breakdown with some skepticism.

How to get a number specific to your property

A per-square-foot rate and a table of typical ranges are useful for planning, but they can't account for your specific lot, existing structures, or design goals. The most reliable next step is a free property review — a first, no-obligation look at what your property can realistically support, followed by introductions to licensed contractors who can give you a firm written estimate.

Frequently asked questions

It's a realistic planning range for our service area, but individual projects can fall outside it. Difficult site conditions can push costs above $350/sqft, while a simple conversion with basic finishes can come in under $285/sqft. Treat it as a starting point, not a quote.

Not in the core per-square-foot construction rate. Permit and impact fees typically add roughly another 8% on top of hard construction costs, and vary by city — check with your local building department for exact fee schedules.

Not necessarily cheaper, but often faster. Prefab and modular units can carry similar total costs to site-built detached ADUs once foundation, delivery, and site work are factored in — the main advantage is typically a shorter build timeline, not a guaranteed lower price.

Want a cost range specific to your property?

Get a free, no-obligation property review and a realistic first look at what your ADU could cost.